Kernow Services Projects

February 2016 - Garden Wall Rendering

Rebuilt a block wall in places and rendered the 20m length and adding coping stones to finish off.

January 2016 - Porch

Removal of wood porch and replaced with new rendered block work and UPVC windows and door. Inside was insulated, dry lined ready for decorating and skirting installed around the perimeter.

December 2015 - T&G Flooring

What was once two rooms with two entrance doorways, is now a large open room with new T&G wood flooring. The floor was concrete levelled before a membrane placed and flooring laid over the top. To open up the room, a new lintel was added, doorways removed and all finished to a high standard with plastering.

Pages